LargestCapCompanies

Largest Data Center Construction Companies and Stocks by Market Cap

The table below ranks the largest data center construction companies by market cap.

The list has 33 data center construction companies worth $532.2B together, and the three largest make up 38% of that. It covers mainly the largest data center construction stocks, not all of them. Prices as of .

Sorted by market cap in US dollars. Converted at the exchange rates of 24 Nov 2026.
RankCompanyMarket capPriceDay change52-week rangeDividend yield
1Quanta Services PWR$91.4B$606.62+8.51%408.36 – 788.750.09%
2Vinci DG.PA$67.4B€112.40+1.26%104.25 – 143.154.55%
3Comfort Systems FIX$40.6B$1,160.09+11.28%878.59 – 2,073.990.38%
4Samsung C&T Corporation 028260.KS$30.1B246,500 KRW−4.46%213,000 – 565,0001.09%
5Hochtief HOT.DE$29.4B€357.60+5.80%273.80 – 554.001.95%
6Emcor EME$28.4B$648.65+7.51%579.48 – 951.960.27%
7Grupo ACS ACS.MC$24.7B€86.95+5.01%72.75 – 141.202.81%
8APi Group APG$19.0B$44.64+6.11%35.57 – 49.990%
9Jacobs Engineering J$18.4B$155.75+3.41%105.68 – 162.000.96%
10WSP Global WSP.TO$17.4B185.05 CAD+3.88%156.64 – 275.240.84%
11Obayashi 1802.T$13.8B3,197.00 JPY−3.36%2,784.00 – 4,439.002.94%
12MasTec MTZ$12.9B$160.56+10.95%143.45 – 441.430%
13Kajima 1812.T$12.7B4,399.00 JPY−6.00%4,398.00 – 8,040.003.71%
14Skanska SKA-B.ST$12.2B302.30 SEK+2.89%233.00 – 308.802.89%
15Eiffage FGR.PA$11.5B€107.25+1.37%96.26 – 147.504.54%
16Taisei Corporation 1801.T$11.0B10,735 JPY+2.19%10,325 – 20,6804.00%
17AECOM ACM$10.3B$79.72+1.35%56.39 – 109.001.73%
18Stantec Inc. STN.TO$9.58B124.37 CAD+3.05%93.15 – 141.020.81%
19Sterling Infrastructure STRL$8.55B$280.34+13.07%239.36 – 1,005.680%
20SPIE SPIE.PA$8.53B€45.24+2.82%40.10 – 53.452.50%
21IES Holdings IESC$7.35B$173.28+11.03%142.66 – 408.260%
22Dycom Industries DY$6.59B$218.40+6.25%186.25 – 566.470%
23Fluor Corporation FLR$5.94B$46.35+6.27%39.33 – 58.350%
24Kinden 1944.T$5.93B5,729.00 JPY+3.13%5,128.00 – 8,580.002.52%
25Kandenko 1942.T$5.54B4,428.00 JPY+5.20%3,944.00 – 7,460.003.42%
26Arcadis ARCAD.AS$4.21B€44.94+0.67%25.88 – 47.902.35%
27MYR Group MYRG$4.18B$268.21+8.28%204.29 – 503.570%
28Argan AGX$4.10B$292.53+8.77%252.88 – 805.751.04%
29Primoris Services Corporation PRIM$3.14B$59.87+11.70%53.15 – 205.500.60%
30EXEO Group 1951.T$3.00B2,352.50 JPY+1.93%2,229.50 – 3,058.003.25%
31Bravida Holding BRAV.ST$2.85B144.30 SEK+2.34%79.30 – 158.102.70%
32Willdan Group WLDN$1.09B$70.96+2.74%61.51 – 137.000%
33Limbach LMB$652M$55.62+5.16%40.74 – 114.950%

Questions about data center construction companies

What is the largest data center construction company?

On this list it is Quanta Services (PWR), with a market cap of $91.4B. Vinci ($67.4B) and Comfort Systems ($40.6B) follow.

How much are the 10 largest data center construction companies worth?

The top 10 are worth $367B together, which is 69% of the list.

How many data center construction companies are large caps?

17 have a market cap above $10B, 14 are between $2B and $10B and 2 are below $2B.

Do data center construction companies pay dividends?

24 of the 33 do, with a median yield of 2.5%.

Where are data center construction companies listed?

16 of the 33 trade in the United States, the rest in 8 other countries.

Stock exchange inCompaniesLargest, market cap
United States16Quanta Services $91.4B
Japan6Obayashi $13.8B
France3Vinci $67.4B
Canada2WSP Global $17.4B
Sweden2Skanska $12.2B
South Korea1Samsung C&T Corporation $30.1B
Germany1Hochtief $29.4B
Spain1Grupo ACS $24.7B

About data center construction companies

The walls of a data center are the cheap part. Most of the money goes into what is inside: switchgear, cables, backup generators, pipes, and chillers. That is why electricians and plumbers earn more on it than the firm that pours the concrete.

Who builds data centers?

A cloud giant or a developer hires a general contractor, who divides the work among dozens of specialists. The largest general contractors in America, such as DPR or Holder, are private. Turner, the number one among them, belongs to Hochtief from Germany, and Hochtief belongs to ACS from Spain. Investors therefore reach them through Europe.

Types of data center construction companies

  • General contractors: Hochtief with Turner, ACS, Skanska, Fluor, Obayashi, Kajima, and Taisei
  • Electrical and mechanical work: Comfort Systems, Emcor, IES, Limbach, and APi with fire protection
  • Connection to the grid: Quanta Services, MasTec, MYR, and Primoris
  • Preparing the land: Sterling Infrastructure
  • Fiber networks: Dycom
  • Power plants: Argan
  • Design and engineering: Jacobs, AECOM, WSP, Stantec, and Arcadis
  • Electrical work in Europe and Japan: SPIE, Vinci, Eiffage, Bravida, Kinden, Kandenko, and EXEO

What to look at

The backlog shows how much work is signed, and it often covers more than a year of revenue. The limit is people. There are not enough electricians, so firms that train or buy whole crews grow the fastest. Margins have risen well above the usual level of the trade, and they will not stay there once new halls stop being started.

Builders of other things are on the list of construction companies, owners of the halls on the list of data center companies.